Objective A.8.3
Problem reporting, change control, change review, and configuration status accounting are established.
Main Description

For a detailed description, consult the DO-178 related standards from RTCA, Inc.  

Required for levels A, B, C, D.

Mapping

The change control plan, configuration management plan form the basis of evidence, corroborated with SCM records and defect reports.

Related elements:

More information: