Objective A.7.8
Test coverage of software structure (data coupling and control coupling) is achieved.
Main Description

For a detailed description, consult the DO-178 related standards from RTCA, Inc.

This is required for levels A, B, and C. This is required with independence for levels A and B.

Mapping

Required evidence is verification results demonstrating the adequacy and completeness of the integrated testing, especially around coupling of the data and control structures.

Related elements:     

More information: