Use the following information to replace the SAN Volume Controller
2145-8A4 service
controller.
About this task
To replace the service controller, complete the following
steps:
Procedure
- Gently push the service controller (shown in Figure 1) into the frame until
the rear connectors are fully seated and the service controller front
metal work is up to the frame.
Figure 1. SAN Volume Controller
2145-8A4 service
controller
- Connect the power cable to the node
and replace the cable-retention bracket. See Replacing the cable-retention bracket.
Note: If you replaced the service controller as part of concurrent
maintenance, you must rewrite the WWNN on the new service controller.
If you do not, and the Fibre Channel switch
zoning uses WWPNs, you cannot add the node back into the cluster until
the Fibre Channel switches in the
SAN are re-zoned. Also, the host systems cannot access the Fibre Channel ports on that node until the
host systems are rebooted.
You must choose
either the WWNN stored on disk or the WWNN stored on the service controller
to allow the node to start. If neither of these options is suitable,
see the Change WWNN? option from the front panel Actions options for
instructions on changing the value.
What to do next
Wait one minute. If
Cluster: is displayed on the front panel, the node is ready to be added
to the system. If Cluster: does
not display, see MAP 5000: Start to
determine how to solve this problem or contact the IBM® support
center.