MAP 5250: 2145
UPS-1U repair verification helps you to verify that field replaceable units (FRUs) that you have exchanged for new FRUs, or repair actions that were done, have solved all the problems on the IBM Spectrum Virtualize™ 2145 UPS-1U.
Before you begin
If you are not familiar with these maintenance analysis
procedures (MAPs), first read Using the maintenance analysis procedures.
You may have been sent here because you have performed a repair and want to confirm that no other problems exist on the machine.
About this task
Perform the following steps:
Procedure
- Are the power-on and load segment 2 indicators for the repaired 2145
UPS-1U illuminated solid green, with service, on-battery, and overload indicators off?
- (from step 1)
Is the IBM Spectrum Virtualize node powered by this 2145
UPS-1U powered on?- NO
- Press power-on on the IBM Spectrum Virtualize node that is connected to this 2145
UPS-1U and is powered off. Go to step 3.
- YES
- Go to step 3.
- (from step 2)
Is the node that is connected to this 2145
UPS-1U still not powered on or showing error codes in the front panel display?- NO
- Go to step 4.
- YES
- Continue with MAP 5000: Start.
- (from step 3)
Does the IBM Spectrum Virtualize node that is connected to this 2145
UPS-1U show "Charging" on the front panel display?- NO
- Go to step 5.
- YES
- Wait for the "Charging" display to finish (this might take up to two hours). Go to step 5.
- (from step 4)
Press and hold the test/alarm reset button on the repaired 2145
UPS-1U for three seconds to initiate a self-test. During the test, individual indicators illuminate as various parts of the 2145
UPS-1U are checked.