Installing the node
There are several steps that you must complete to prepare for and then install the SA2 and SV2 hardware.
Before you begin
If you are adding a new I/O group, there is no need to turn off existing and operating system nodes before you begin.
Procedure
- Prepare for the hardware installation by confirming that you have all the required planning information and parts.
- Install the nodes.
- Connect Fibre Channel and Ethernet cables.
- Verify that the node is operational.