Unpacking the node
Before you unpack the node, ensure that you review and follow all related instructions.
Before you begin
Note: You will need a box knife to unpack the node.
About this task
CAUTION:
To lift the assembled enclosure requires three persons
unless suitable lifting equipment is available or the enclosure is unpacked and dismantled as
described in the procedure.
Procedure
- Cut the box tape and open the lid of the shipping carton.
- Remove the rail kit box and set it aside in a safe location.
- Lift the front and rear foam packing pieces from the carton.
- Remove the four corner reinforcement pieces from the carton.
- Using the box knife, carefully cut the four corners of the carton from top to bottom.
-
Fold the sides and back of the carton down to uncover the rear of the node.
If necessary, carefully cut along the lower fold line of the sides and remove them.
- Carefully cut the raised section of the foam packing away from the rear of the enclosure.
- Carefully cut open the bag covering the rear of the enclosure.
- Remove the left power supply unit (PSU) from the enclosure.
- Record the last six digits of the serial number on the back of the power supply, and then set the power supply aside.
- Remove the right PSU, record its serial number, and set it aside.
- Remove the left power interposer from the enclosure.
- Record the last six digits of the serial number on the power interposer, and then set it aside.
- Remove the right power interposer, record its serial number, and set it aside.
- Remove the node canister from the enclosure.
- Record the serial number on the canister release handle, and then set the canister aside.
- Lift the enclosure from the shipping carton.