Before you remove the 2145 UPS-1U ,
read all safety notices.
Before you begin
Use the reference numbers in parentheses at the end of each notice (for example,
D005) to find the matching translated notice in IBM System Storage SAN Volume Controller Safety Notices.
DANGER
Uninterruptible power supply (UPS) units contain specific hazardous
materials. Observe the following precautions if your product contains a UPS:
The UPS contains lethal voltages. All repairs and service must be performed only by an
authorized service support representative. There are no user serviceable parts inside the
UPS.
The UPS contains its own energy source (batteries). The output receptacles might carry live
voltage even when the UPS is not connected to an AC supply.
Do not remove or unplug the input cord when the UPS is turned on. This removes the safety
ground from the UPS and the equipment connected to the UPS.
The UPS is heavy because of the electronics and batteries that are required. To avoid
injury, observe the following precautions:
Do not attempt to lift the UPS by yourself. Ask another service representative for
assistance.
Remove the battery, electronics assembly, or both from the UPS before removing the UPS
from the shipping carton or installing or removing the UPS in the rack. (D007)
CAUTION:
This part or unit is heavy but has a weight smaller than 18 kg
(39.7 lb). Use care when lifting, removing, or installing this part or unit. (C008)
About this task
Complete the following procedure to remove the 2145 UPS-1U.
Attention: Check to make sure that the SAN Volume Controller that is powered by this 2145 UPS-1U is shut down and turned off
before step 1. See MAP 5350: Powering off a node.
Procedure
At the front of the 2145 UPS-1U,
press and hold the power button ( 1 in Figure 1) until the power light is extinguished (approximately 5
seconds). On some versions of the 2145 UPS-1U, you need a pointed device, such
as a screwdriver, to press the power button. The 2145 UPS-1U enters standby mode.
Figure 1. The 2145 UPS-1U front-panel
assembly
At the back of the 2145 UPS-1U,
remove the power cable retainer before you disconnect the SAN Volume Controller power cable from load segment
receptacle 2 ( 3 in Figure 2).
Disconnect the signal cable from the communication port
( 2 in Figure 2).
Disconnect the main power cable from the main power source
( 1 in Figure 2).
Figure 2. 2145 UPS-1U (rear view)
Some SAN Volume Controller node types have two power
supply units. Both power supplies must be connected to the same 2145 UPS-1U. The SAN Volume Controller 2145-CF8 is an example of a node that has
two power supplies.
Remove the 2145 UPS-1U front
panel, as shown in Figure 3.
Note: The right side of the panel of the 2145 UPS-1U can be difficult to remove. If
so, insert a flat-blade screwdriver between the right side of the cover and the frame to gently pry
it free.
Figure 3. Removing the 2145 UPS-1U front
panel
Disconnect the internal battery connector, which is circled
in Figure 4.
Figure 4. The 2145 UPS-1U internal-battery
connector
After you pull the two connectors apart, cover the bare battery connector (shown in Figure 5) with adhesive tape.
Figure 5. The 2145 UPS-1U internal battery
connector with protective tape
Reinstall the front panel.
At the front of the 2145 UPS-1U,
unscrew the two mounting screws 1 , as shown in Figure 6.
Figure 6. Mounting screws for the 2145 UPS-1U
From the back of the rack, push the 2145 UPS-1U forward approximately 5 cm (2 in)
to aid you in pulling it from the rack.
Go to the front of the rack.
Pull the 2145 UPS-1U forward
and remove it from the rack.