You can remove the power cable from the 2145 UPS-1U if
you are having problems with the power supply and suspect that the
power cable
is defective.
About this task
Perform the following steps to remove the power cable.
Procedure
Remove the power from each SAN Volume Controller node. See MAP 5350: Powering off a node for
information about removing the power
cable from the SAN Volume Controller.
Press and hold the on/off button ( 2 ) until the power light
( 1 ) is extinguished (approximately 5 seconds). On some versions of the
2145 UPS-1U, you need a pointed device,
such as a screwdriver, to press the on/off button. The 2145 UPS-1U enters standby mode, with all
indicators off.
Figure 1 illustrates the front and
rear views of the 2145 UPS-1U.Figure 1. Front and back panels for the 2145 UPS-1U
1 Power on indicator
2 On/off button
3 Power cable
Disconnect the power cable ( 3 ) from the main power source.
Replace the power cable and make sure it is seated.
The 2145 UPS-1U enters
standby mode. All indicators are off and power is not available to
the SAN Volume Controller.
The battery recharges when necessary.
To turn on the 2145 UPS-1U, press
and hold the on/off button ( 2 ) until the 2145 UPS-1U power button
( 1 ) is illuminated (approximately 5 seconds).
On some versions of the 2145 UPS-1U,
you need a pointed device, such as a screwdriver, to press the on/off button. The front panel
indicators then cycle through a startup sequence while the 2145 UPS-1U conducts a self-test. When the
self-test completes, the power-on indicator and the load indicators illuminate to show that the 2145 UPS-1U is supplying power. The 2145 UPS-1U resumes service in normal
mode.