Replacing a Storwize V7000 Gen2 expansion canister

To replace a faulty expansion canister with a new one received from CRU / FRU stock, use this procedure.

About this task

Attention: Although many components are hot-swappable, they are intended to be used only when your system is not active (no I/O operations). If your system is powered on and processing I/O operations, go to the management GUI and follow the fix procedures. Initiating the replacement actions without the assistance of the fix procedures can result in loss of data or loss of access to data.

Be careful when you are replacing the hardware components that are located in the back of the system. Do not inadvertently disturb or remove any cables that you are not instructed to remove.

Do not remove an expansion canister unless directed to do so by a service procedure.

To replace an expansion canister, do the following steps:

Procedure

  1. Read the safety information in Preparing to remove and replace parts.
  2. Refer to Procedure: Understanding system volume dependencies to determine whether to do this procedure.
  3. Carefully identify the expansion canister that you are replacing. If possible, go to Monitoring > System in the management GUI. On the System -- Overview page, select the directional arrow near the expansion enclosure that you are replacing. On the Enclosure Details page, select Enclosure Actions > Turn Identify On to set the canister fault LED blinking.
  4. Record which SAS cables are plugged into the specific ports of the expansion canister. Select SAS Chain View to display the SAS ports that are currently used by the system.
    The cables must be inserted back into the same ports after the replacement is complete; otherwise, the system cannot function properly.
  5. Disconnect the SAS cables from the canister.
  6. Open the two release levers as shown in Figure 1.
    The canister moves out of the slot approximately 0.6 cm (0.25 inch).
  7. Slide the canister out of the slot.
  8. Open the release levers of the replacement canister.
  9. Push the replacement canister into the slot until it stops.
  10. Finish inserting the canister by closing both release levers so that both orange latches click into place.
  11. The canister is correctly installed when the rear face of the canister is flush with the rear edge of the enclosure.

    If the enclosure is powered on and the canister is correctly installed, the canister starts automatically.

  12. Reattach each SAS cable into the port from which it was removed in step 5.
    1. Ensuring the SAS cable connectors are inserted with the pull tab to the bottom of the connector, gently push the connector in until a slight click is felt or heard.
    2. Verify that the connector is fully inserted by gently pulling on it (not on the tab).

      You should not be able to remove it.

      If the enclosure is powered on and the SAS connector is correctly inserted into the port, the green SAS link LED above the port lights up.

    Figure 1. Removing and replacing the Storwize V7000 Gen2 expansion canister
    Release lever that is engaged with the expansion canister that is ready to be removed