Connecting the redundant AC-power switch to the site power
You must connect the redundant AC-power switch to the site power before you test the redundant AC-power switch.
About this task
Procedure
- Determine a suitable cable route from the redundant AC-power switch to the power distribution units.
- Route the main input-power cable of the redundant AC-power switch to the specified power distribution unit, and connect it.
- Route the backup input-power cable of the redundant AC-power switch to the specified power distribution unit, and connect it.
- Verify that the redundant AC-power switch power cables are tidy. Ensure that they do not obstruct other equipment and that they are tied in place where necessary.