MAP 5400: Front panel helps you to solve problems that
have occurred on the front panel.
Before you begin
If you are not familiar with these maintenance analysis
procedures (MAPs), first read Using the maintenance analysis procedures.
This MAP applies to all SAN Volume Controller models.
Be sure that you know which model you are using before you start this procedure.
To determine which model you are working with, look for the label that identifies the model type on
the front of the node.
You
might have been sent here because:
- A problem occurred during the installation of a SAN Volume Controller system,
the front-panel display test failed, or the correct node number failed
to be displayed
- Another MAP sent you here
About this task
Perform the following steps:
Procedure
- Is the power LED on the operator-information
panel illuminated
and showing a solid green?
- (from step 1)
Is
the service controller error light 1 that
you see in Figure 1 illuminated
and showing a solid amber? Figure 1. SAN Volume Controller service
controller error light
- NO
- Start the front panel tests by pressing and holding the select
button for five seconds. Go to step 3.
Attention: Do
not start this test until the node is powered on for at least two
minutes. You might receive unexpected results.
- YES
- The SAN Volume Controller service
controller has failed.
- (from step 2)
The
front-panel check light illuminates and the display test of all display
bits turns on for 3 seconds and then turns off for 3 seconds, then
a vertical line travels from left to right, followed by a horizontal
line travelling from top to bottom. The test completes with the switch
test display of a single rectangle in the center of the display.
Did
the front-panel lights and display operate as described?- NO
- SAN Volume Controller front
panel has failed its display test.
- YES
- Go to step 4.
- (from step 3)
Figure 2 provides
four examples of what the front-panel display shows before you press
any button and then when you press the up button, the left and right
buttons, and the select button. To perform the front panel switch
test, press any button in any sequence or any combination. The display
indicates which buttons you pressed.
Check each switch in turn.
Did the service panel switches and display operate as described in Figure 2?
- NO
- The SAN Volume Controller front
panel has failed its switch test.
- YES
- Press and hold the select button for five seconds to exit the
test. Go to step 5.
- Is the front-panel display now showing Cluster:?
- NO
- Continue with MAP 5000: Start.
- YES
- Keep pressing and releasing the down button until Node is
displayed in line 1 of the menu screen. Go to step 6.
- (from step 5)
Is
this MAP being used as part of the installation of a new node? - NO
- Front-panel tests have completed with no fault found. Verify the
repair by continuing with MAP 5700: Repair verification.
- YES
- Go to step 7.
- (from step 6)
Is
the node number that is displayed in line 2 of the menu screen the
same as the node number that is printed on the front panel of the
node? - NO
- Node number stored in front-panel electronics is not the same
as that printed on the front panel.
- YES
- Front-panel tests have completed with no fault found. Verify the
repair by continuing with MAP 5700: Repair verification.