Installing the SAN Volume Controller 2145-SV1

You must complete several tasks to install the SAN Volume Controller 2145-SV1 node.

About this task

Installing a SAN Volume Controller 2145-SV1 node consists of the following tasks:

  1. Spitting the support rails, attaching one part to the node and the other to the rack.
  2. Installing the node in the rack, rejoining the support rails.
  3. Installing the cable-management arm in the rack cabinet.