Installing the SAN Volume Controller 2145-CG8

There are several steps that you must complete to install the SAN Volume Controller 2145-CG8.

About this task

Installing the SAN Volume Controller 2145-CG8 consists of the following tasks:
  1. Installing the support rails in the rack cabinet.
  2. Installing the SAN Volume Controller 2145-CG8.
  3. Installing the cable-management arm in the rack cabinet.
  4. Connecting the SAN Volume Controller 2145-CG8 to the uninterruptible power supply.