Installing the SAN Volume Controller 2145-CG8
There are several steps that you must complete to install the SAN Volume Controller 2145-CG8.
About this task
Installing the SAN Volume Controller
2145-CG8 consists
of the following tasks:
- Installing the support rails in the rack cabinet.
- Installing the SAN Volume Controller 2145-CG8.
- Installing the cable-management arm in the rack cabinet.
- Connecting the SAN Volume Controller 2145-CG8 to the uninterruptible power supply.