SAN Volume Controller physical installation planning

Before the IBM® service representative can set up your environment, you must verify that the prerequisite conditions for system, the uninterruptible power supply, and optional redundant AC-power switch installation are met.

About this task

This information applies to the supported hardware components. Answer the following questions before you start the installation process.

  1. Does your physical site meet the environment requirements for SAN Volume Controller, uninterruptible power supply (UPS), and the redundant AC-power switch?
  2. Do you have adequate rack space for your hardware? Ensure that you have the following rack space for your components:
    • The SAN Volume Controller: One Electronic Industries Alliance (EIA) unit high for each node.
    • The 2145 UPS-1U: One EIA unit high for each 2145 UPS-1U.
    • If you are using a redundant AC-power switch: One EIA unit high for each redundant AC-power switch
    • The SAN Volume Controller 2145-DH8: Two EIA units high, with no UPS.
  3. Do the power circuits that you are planning to use have sufficient capacity and the correct sockets for your SAN Volume Controller installation?
    • A clearly visible and accessible emergency power off switch is required.
    • If you are using the redundant AC-power switch, the redundant AC-power switch main input and the other circuit connect to the redundant AC-power switch backup input.
  4. Have you provided appropriate connectivity by preparing your environment?
  5. Do you have a keyboard and display available in the unusual event that a service action requires them? The SAN Volume Controller 2145-CG8 and SAN Volume Controller 2145-CF8 nodes require a Universal Serial Bus (USB) keyboard.