Replacing the operator-information panel cables: 2145-SV1

Use these instructions when you are prompted to replace the operator-information panel cables for the SAN Volume Controller 2145-SV1 node.

Before you begin

DANGER
Multiple power cords. The product might be equipped with multiple power cords. To remove all hazardous voltages, disconnect all power cords. (L003)
Safety icons for multiple power cords

Take precautions to avoid damage from static electricity. Wear an anti-static wrist strap and use a static-protected mat or surface.

About this task

This service action assumes that the following conditions are met.

Procedure

To replace the operator-information panel cables, complete the following steps.

  1. Read the safety information.
  2. Connect each cable to the appropriate connector at the rear of the operator-information panel, as shown in Figure 1.
    CAUTION:
    Gently push the end of each cable into the appropriate connector. Using excessive force might damage the cables or connectors.
    1. Connect the blue USB cable to connector  A .
    2. Connect the black LED and power button cable to connector  B .
    Figure 1. Cable connectors on the back of the 2145-SV1 operator-information panel
    Cable connectors on the back of the operator-information panel
  3. Connect each cable to the appropriate connector on the main board, as shown in Figure 2.
    1. Connect the blue USB cable to connector  A .
    2. Connect the black LED and power button cable to connector  B .
    Figure 2. Cable connectors on the 2145-SV1 main board for the operator-information panel cables
    Cable connectors on the main board for the operator-information panel cables
  4. Replace the top covers, as described in Replacing the top covers: 2145-SV1.
  5. If you removed the node from the rack, replace the node in the rack, as described in Replacing a node in a rack: 2145-SV1.
  6. If you removed any Fibre Channel or Ethernet cables, use the labels you that placed on each cable to identify the ports from which they were removed.
  7. Replace the power cords. When the power cords are plugged in, the node turns on.