You can remove the power cable from the 2145 UPS-1U if
you are having problems with the power supply and suspect that the
power cable
is defective.
About this task
Perform the following steps to remove the power cable.
Procedure
- Remove the power from each SAN Volume Controller node. See MAP 5350: Powering off a node for
information about removing the power
cable from the SAN Volume Controller.
- Press and hold the on/off button ( 2 ) until the power light
( 1 ) is extinguished (approximately 5 seconds). On some versions of the
2145
UPS-1U, you need a pointed device,
such as a screwdriver, to press the on/off button. The 2145
UPS-1U enters standby mode, with all
indicators off. Figure 1 illustrates the front and
rear views of the 2145
UPS-1U.
Figure 1. Front and back
panels for the 2145
UPS-1U
- 1 Power-on indicator
- 2 On/off button
- 3 Power cable
- Disconnect the power cable ( 3 ) from the main power source.
- Replace the power cable and make sure it is seated.
The 2145
UPS-1U enters
standby mode. All indicators are off and power is not available to
the SAN Volume Controller.
The battery recharges when necessary.
- To turn on the 2145
UPS-1U, press
and hold the on/off button ( 2 ) until the 2145
UPS-1U power button
( 1 ) is illuminated (approximately 5 seconds).
On some versions of the 2145
UPS-1U,
you need a pointed device, such as a screwdriver, to press the on/off button. The front panel
indicators then cycle through a startup sequence while the 2145
UPS-1U conducts a self-test. When the
self-test completes, the power-on indicator and the load indicators illuminate to show that the 2145
UPS-1U is supplying power. The 2145
UPS-1U resumes service in normal
mode.