Verifying the SAN Volume Controller 2145-8G4 installation
You must verify the SAN Volume Controller installation after the installation has completed.
Before you begin
This task shows you how to verify the installation after you install the system in the rack and connect it to the uninterruptible power supply, the storage area network (SAN), and the Ethernet.
Procedure
To verify installation, complete the following steps.
- Press the power-control button. Because the button is
recessed, you might need a pointed device, such as a screwdriver, to press the power-control button.
Verify that the green power LED is lit. If the LED is not illuminated, see MAP 5000: Start to repair the
problem. Note: You do not need to install any software. The node boots automatically.Figure 1 illustrates the controls and indicators on the front panel that are used to verify the installation.Figure 1. SAN Volume Controller 2145-8G4 front panel

Front-panel
display
Navigation
buttons
Operator-information
panel
Power
LED
Power-control
button
Select
button
Node identification label
Verify that the node is booting without error. If it boots without error, either the Charging, Recovering, or the Cluster: message is displayed in the first line of the front-panel display.
- Press and hold the select button for 5 seconds. The check light comes on and a display test is initiated. Check that all display cells light and that a bar scrolls horizontally and vertically across the display. When the display test is complete, the check light goes off and a button test is started.
- Press the up, down, left, and right buttons to verify that
they are working. Figure 2 shows
four examples of what the front panel should display when you press
the buttons. After you finish testing the buttons, press and hold the
select button for five seconds to exit the test. Figure 2. Front-panel display when push buttons are pressed

- If the Charging or Recovering message is displayed on the front-panel display, press the select button to switch to the menu. The menu continues to be displayed while you press the buttons on the front panel. If you do not press any buttons within 60 seconds, the menu changes to display the charging progress. You can switch the front-panel display to the menu at any time by pressing the select button again.
- Press and release the up button or down button until the Node: option is displayed on the first line of the front-panel display.
- Verify that the node number that is displayed on
the second line of the front-panel display is the same as the node number that is printed on the
front panel of the
node. Figure 3 shows
how the node number is displayed on the front panel. If the node number is not the same, contact the IBM® Support
Center. Figure 3. Node number

- Press and release the up button or down button until the Ethernet
option is shown on the front-panel display. The
second line of the front-panel display in Figure 4 shows
the message Inactive. This message indicates that,
although an Ethernet connection is available, it cannot yet be used. Figure 4. Ethernet mode

- Press and release the up button or down button until the FC Port-1 option shows in the display.
- Check whether the second line of the front-panel display shows the message Active. If Active is not shown on the second line, go to MAP 5600: Fibre Channel to repair the fault.
- Press and hold the down button.
- Press and release the select button.
- Release the down button. The operational speed of the Fibre Channel link is displayed. Use the cable connection table that is provided by the customer to verify that the Fibre Channel link is operating at the expected speed. If the operational speed does not match the expected speed, go to MAP 5600: Fibre Channel to repair the fault.
- Press the select button to return to the Fibre Channel status display.
- Press the right button to display each port in turn and ensure that the port is active and the speed is correct.
- If you want
to select a language other than English:
- Press the up or down button until Select Language? is displayed.
- Press the select button.
- Press the left or right button until the required language is displayed.
- Press the select button.
If the battery needed to be charged, the Charging or Recovering message is replaced by the Cluster: message when the battery is fully charged. The progress bar no longer displays. The installation of the hardware is now complete. No software installation is required.If necessary, continue with the installation and configuration instructions to create a new cluster and to add nodes into a cluster.