Replacing the operator-information panel
cables: 2145-SV1
Use these instructions when you are prompted to replace the operator-information panel cables for the SAN Volume Controller 2145-SV1 node.
Before you begin
DANGER
Multiple power cords. The product might be equipped with multiple AC
power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power
cords and power cables. (L003)
Take precautions to avoid damage from static electricity. Wear an anti-static wrist strap and use
a static-protected mat or surface.
About this task
This service action assumes that the following conditions are met.
The power cables are disconnected and the node is turned off.
Ensure that the node data is mirrored and synchronized, and that there are no dependent volumes.
See MAP 5350: Powering off a node.