You might need to remove and replace the Ethernet edge board in a 2145-SV1 node.
Before you begin
DANGER
Multiple power cords. The product might be equipped with multiple
power cords. To remove all hazardous voltages, disconnect all power cords. (L003)
CAUTION:
The doors and covers to the product are to be closed at all times
except for service by trained service personnel. All covers must be replaced and doors closed at
the conclusion of the service operation. (C013)
Use these instructions when you need to replace the Ethernet edge board in a SAN Volume Controller 2145-SV1 node. The Ethernet edge board
contains 10 Gbps electrical Ethernet ports.
Procedure
Before you power off the node, verify that hosts will not lose access to data in volumes.
Follow the procedure that is described in MAP 5350: Powering off a node.
Remove and label the Ethernet cables that are attached to Ethernet ports 1-3
( 8 , 9 , and
10 ), as shown in Figure 1.
Figure 1. Connectors on the rear of the 2145-SV1 node
1 Power supply 1
2 Power supply 2
3 Video port
4 Serial port (not used)
5 Rear USB port 1
6 Rear USB port 2
7 Unused Ethernet port
8 10 Gbps Ethernet port 1
9 10 Gbps Ethernet port 2
10 10 Gbps Ethernet port 3
11 Technician port (Ethernet)
Removing the Ethernet edge board
Disconnect each power supply unit in the node from its power outlet so that the node is powered
off.
Confirm that all of the LEDs on the rear of the enclosure are off.
Slide the node out on its slide rails to the fully extended position.