You can replace faulty support rails with new rails that are received from
stock.
About this task
As part of this procedure, the node must be removed from the rack. Two persons are required to
remove and replace the node. Follow all safety precautions when you complete this procedure.
Record the shelf number of the support rail so that the replacement rails can be installed
into the same position.
At the rear of the rack, remove the black M5 screws from the rear bracket of the rail. Two
screws are attached to each bracket. Then, open the rear hinge bracket, as shown in the following
figure.
Figure 1. Opening the rear hinge bracket of the mounting rail
At the front of the rack, hold on to the rail and open the front hinge bracket.
Compress the rail to shorten it. Then, hold onto the rail and open the rear hinge bracket, as
show in the following figure.
Figure 2. Compressing the rail for removal from rack