Installing the SAN Volume Controller 2145-SV1
You must complete several tasks to install SAN Volume Controller 2145-SV1 node.
About this task
Installing a SAN Volume Controller 2145-SV1 node consists of the following tasks:
- Spitting the support rails, attaching one part to the node and the other to the rack.
- Installing the node in the rack, rejoining the support rails.
- Installing the cable-management arm in the rack cabinet.