Open the stop bracket, which makes rotating the cable
management arm on and off the support bar easier.
Push the tabs above and below the stop bracket to close
it.
Figure 6. Closing the stop bracket
Connect and route the cables as
shown in Figure 7.
Connect the power cords and other cables
to the rear of the node.
Route the cables and power cords on the cable management
arm and secure them with cable ties or hook-and-loop fasteners.
Note:
The location of the cable straps can vary in different systems.
Use the cable straps that are provided on the rear of the system
to retain the cables and prevent them from sagging.
Figure 7. Connecting and routing the cables
Secure the cables with the hook-and-loop
fastener strap, as shown in Figure 8.
Note:
Cables must be bundled with the hook-and-loop fastener strap to
ensure full range of movement of the cable management arm.
Make sure that the cables do not sag below the U space so they
cannot interfere with the lower systems.
Allow slack in all cables to avoid tension in the cables as the
cable management arm moves.
Figure 8. Securing the cables with hook-and-loop fastener strap
Optional: You can
install the cable management arm assembly on the opposite side, as
shown in Figure 9.
Press the release buttons 1 and
slide the mounting brackets 2 out of
the cable management arm.
Rotate the cable management arm 3 .
Flip the mounting brackets 4 .
Insert the inner bracket (marked with a capital letter
I) and outer bracket (marked with a capital letter O) into the cable
management arm 5 .
Figure 9. Installing
the cable management arm on the opposite side
Optional: If you are in a vibration-prone area,
or if you are shipping the rack with the system installed, secure
the cable management arm and the server to the rack as shown in Figure 10.
Insert the M6 screws to the rear of the slides.
Use a cable tie to secure the free end of the cable
management arm to the rack.
Figure 10. Securing
the cable management arm and node
Optional: If you are in a vibration-prone area,
or if you are preparing to move the rack cabinet, install the front
screws as shown in Figure 11.
Slide the server into the rack until the release latches 1 engage.
Insert the M6 screws 2 in
the front of the server.