Procedure: Powering on the Storwize V7000 Gen2system
After installing all hardware components, you must power on the Storwize® V7000 Gen2 system and check its status.
About this task
Attention: Do not power on the system with any open bays or slots. Open bays
or slots disrupt the internal air flow, causing the drives to receive insufficient cooling.
Every unused drive bay must be occupied by a filler panel.
Filler plates must be installed in all empty host interface adapter slots.
Procedure
To power on the system, complete the following steps.
Power on all expansion enclosures by connecting both power supply units of the enclosure to
their power sources, using the supplied power cables.
If the power sources have circuit breakers or switches, ensure that they are turned on.
The enclosure does not have power switches. Repeat this step for each expansion enclosure in
the system.
Note: Each enclosure has two power supply units. To provide power failure
redundancy, connect the two power cords to separate power circuits.
Check the LEDs on each expansion canister, as displayed in Figure 1.