Before you can begin installing your system, you must unpack and verify your order and
make other preparations.
This topic contains a set of instructions to help you unpack your shipping
order and install your system. The first steps involve verifying your order, becoming familiar
with the hardware component terminology, and ensuring that you have met the environmental
requirements. The next steps involve installing the hardware and attaching the data cables and
power cords. The final step helps you access the management GUI and configure your system.
Important information:
- This topic assumes that you have read the planning information regarding
your physical environment.
- Ensure that any cables that you are supplying are available for installation.
Be familiar with the following information
- See Caution notices for the system and Danger notices for the system
for a summary of the situations that can be potentially hazardous to you. Before installing,
read and understand the following caution and danger statements.
- Use safe practices when lifting.
The fully populated enclosure weighs about 45 kg (99 lbs). At least
three people are required to lift and install the enclosure into the rack or to remove an enclosure
from the rack.
CAUTION:
Use safe practices when lifting.
(27)
Also keep in mind that a rack full of equipment is extremely heavy.
DANGER
Heavy equipment–personal injury or equipment damage might
result if mishandled. (D006)
- The following general precautions should be observed, even though the power-on steps differ
slightly from the directions that you will follow for this product:
DANGER
When working on or around the system, observe the following
precautions:
Electrical voltage and current from power, telephone, and communication cables
are hazardous. To avoid a shock hazard:
- If IBM® supplied a power cord(s), connect power to
this unit only with the IBM provided power cord. Do not
use the IBM provided power cord for any other
product.
- Do not open or service any power supply assembly.
- Do not connect or disconnect any cables or perform installation, maintenance, or
reconfiguration of this product during an electrical storm.
- The product might be equipped with multiple power cords. To remove all hazardous voltages,
disconnect all power cords.
- Connect all power cords to a properly wired and grounded electrical outlet. Ensure that the
outlet supplies proper voltage and phase rotation according to the system rating plate.
- Connect any equipment that will be attached to this product to properly wired outlets.
- When possible, use one hand only to connect or disconnect signal cables.
- Never turn on any equipment when there is evidence of fire, water, or structural
damage.
- Disconnect the attached power cords, telecommunications systems, networks, and modems
before you open the device covers, unless instructed otherwise in the installation and
configuration procedures.
- Connect and disconnect cables as described in the following procedures when installing,
moving, or opening covers on this product or attached devices.
To disconnect:
- Turn off everything (unless instructed otherwise).
- Remove the power cords from the outlets.
- Remove the signal cables from the connectors.
- Remove all cables from the devices.
To connect:
- Turn off everything (unless instructed otherwise).
- Attach all cables to the devices.
- Attach the signal cables to the connectors.
- Attach the power cords to the outlets.
- Turn on the devices.
- Sharp edges, corners and joints might be present in and around the system. Use care when
handling equipment to avoid cuts, scrapes and pinching. (D005)
Tools needed
A flat-blade screwdriver with a 7 mm (1/4 inch) head and a box cutter knife are required for
installation.